Mountain Foot Bridge
This is a bridging system wherein the modules, each weighing less than 18kgs can be carried by soldiers, assembled to form a bridge of maximum span 35m and erected over wet/dry gaps within 90 minutes.
This is a bridging system wherein the modules, each weighing less than 18kgs can be carried by soldiers, assembled to form a bridge of maximum span 35m and erected over wet/dry gaps within 90 minutes.